Continued work on the schematic and wire list. Added and started connecting GTR 200B, Jacks, Dimmer switches, flap and trim motors and stick grip switches to the schematic. Continued work on the GEA 24 and GAD 27 parts. Verified connections on the spreadsheet and updated spreadsheet and schematic symbols as needed.